Posted on Sep 23, 2020
ISSA Engineering
Auckland Habour Bridge temporary Strut. Urgent fabrication job to replace the one damaged by the container truck and get Aucklands traffic moving again as quickly as possible.
Great Team effort by AHB, ASM, Beca & ISSA Eng.
Many thanks to suppliers: Vulcan Steel Plate, Pipes NZ, MacKenzie Transport & Materials & Testing Labs (Welding inspection)
Great Team effort by AHB, ASM, Beca & ISSA Eng.
Many thanks to suppliers: Vulcan Steel Plate, Pipes NZ, MacKenzie Transport & Materials & Testing Labs (Welding inspection)